resource conservationTechnologyMechanical

El Monte Elementary

1400 Dina Dr Concord CA 94518  

View Mt Diablo Unified School District Sites in a larger map


Site Attributes
Date Built 1955
Site Acreage 7.5
Attendance 424


folder Solar Project Overview
folder Solar: FAQ's
Solar Performance



Site Updates


Proposed Scope of Work

Resource Conservation
  • Installation of Ground Mounted Solar Structure
  • Installation of Centralized Irrigation Management System
Technology Systems
  • Fiber Optic Backbone Installation
  • Installation of Network Cabling and Upgrades
  • Installation of Technology Classroom Enhancements
-Electrical Systems
  • Security System Installation
  • Interior Lighting Replacement
Mechanical Systems
  • Installation of Classroom Heating, Ventilation, and Air Conditioning
  • Installation of Admin. Heating, Ventilation, and Air Conditioning
  • Installation of Elementary Kitchen Air Conditioning
-Site Improvements
  • Paved Playground Repair
  • Concrete Flatwork Repair
-Building Shell Integrity
  • Door Hardware Replacement
  • Window Repair/Replacement
  • Roofing System Repair/Replacement
-Interior Finish Upgrades
  • Floor Covering (Aggregate) Replacement
  • Restroom Renovation
  • Food Service:  Code Improvements